| Marine
Facilities
Berthing Facilities (5 Berths: Iron Ore 1; Coal 1; Multipurpose
3)
Depth in harbor 19.5m below CD
Mechanized Coal and Iron Ore discharge system for vessel
size upto 200,000 DWT
Mechanized Wagon Loading and Wagon Tippling System
New generation Mobile Harbor Cranes for other bulk and
break bulk cargoes
Coal stackyard and Iron ore stackyard with storage capacity
of approximately
1 MMT each
Covered transit storage for bulk and break cargoes
Extensive ancillary facilities and state-of-the-art
utilities / services
Flexibility for future expansion of cargo handling facilities
as per demand
Round the clock Cargo handling and Marine operations
Environmental friendly operation
| Berths
|
Size |
Alongside
Depth |
| 1 |
Coal
Cargo |
320 x 25 m |
19.50 m below CD |
| 2 |
Iron Ore Cargo |
340 x 25 m |
19.50 m below CD |
| 3 |
Other Dry Cargo |
275 x 31 m |
15.50 m below CD |
| 4 |
Multipurpose Cargo |
281 x 31 m |
15.50 m below CD |
| 5 |
General Cargo |
242 x 28 m |
14.00 m below CD |
Berth
Configuration in Phase 1 |
Cargo Handling Facilities
New generation mechanized cargo handling system has being
installed at Gangavaram Port for faster and efficient
handling and evacuation of cargo with minimum handling
loss. Cargo handling equipment installed in Phase-I
development include, Ship Loader for bulk exports, Ship
Unloaders for bulk imports, Mobile Harbour Cranes for
bulk/break bulk cargo, associated conveyer system for
transportation to and from stackyard, Stackers &
Reclaimers for stackyard operations and Wagon loader
& Wagon tipplers for handling Railway rakes.
Click for Image of Phase-1 Development Plan
|